Paved surfaces, particularly parking lots, are constantly exposed to harsh elements like rain, UV rays, and chemicals such as oil. These factors can cause significant damage over time, leading to cracks and surface degradation. Fortunately, Kleenco Construction, a premier paving contractor, offers specialized asphalt sealcoating services designed to extend the life of your pavement and enhance its appearance.
Why Choose Asphalt Sealcoating?
This pavement maintenance service is essential for maintaining your parking lot. This protective layer shields pavement from the damaging effects of weather and chemicals, preventing cracks and deterioration. By opting for regular seal coating, you protect your investment, prolong the lifespan of your parking lot, and save on future repair costs.
Kleenco Construction is a trusted sealcoating company that provides top-tier blacktop sealcoating services to commercial properties.
Optimal Timing for Sealcoating
Timing is crucial for effective asphalt sealcoating. The best periods for application are early summer and late spring, characterized by dry, sunny days with temperatures between 60 and 85 degrees Fahrenheit. These conditions ensure that the sealcoat dries properly. If rain is in the forecast, it’s advisable to reschedule to achieve the best results.
Assessments and Tailored Paving Services
At Kleenco Construction, we start with a thorough assessment to determine the most suitable paving service for your needs. Our experts evaluate the current condition of your asphalt to decide whether a simple sealcoat is sufficient or if more extensive measures, like resurfacing, are necessary. This detailed approach ensures that we provide the most effective and economical solution for your pavement maintenance.
Understanding Sealcoating and Resurfacing
Sealcoating is ideal for maintaining and protecting paved surfaces in good condition but showing signs of wear. However, resurfacing might be a better option if your parking lot is damaged. Resurfacing involves removing the top layer of asphalt and applying a new layer, restoring appearance and functionality.
Common Questions About Asphalt Sealcoating
When is the best time to sealcoat?
- The ideal time for sealcoating is during warm, dry weather in early summer or late spring.
Can I sealcoat new pavement immediately?
- It’s best to wait 60 days after asphalt paving before applying a sealcoat. This allows surface oils to dissipate, ensuring better adhesion.
How long before I can use the sealcoated lot?
- Typically, you should wait at least 24 hours before driving on newly seal-coated asphalt. This period allows the sealer to cure properly.
Will my business be disrupted?
- To minimize disruption, Kleenco Construction can sealcoat your lot in sections, allowing your business to remain operational.
Contact Us Today for Quality Parking Lot Sealcoating!
Ready to enhance the durability and appearance of your commercial asphalt pavement? Contact Kleenco Construction today for professional asphalt sealcoating and pavement maintenance services.
Trust Kleenco Construction for all your commercial paving needs, ensuring your parking lots remain in top condition year-round.